Non-preemptive Scheduling in a Smart Grid Model and its Implications on Machine Minimization

February 22, 2016 Β· Declared Dead Β· πŸ› Algorithmica

πŸ‘» CAUSE OF DEATH: Ghosted
No code link whatsoever

"No code URL or promise found in abstract"

Evidence collected by the PWNC Scanner

Authors Fu-Hong Liu, Hsiang-Hsuan Liu, Prudence W. H. Wong arXiv ID 1602.06659 Category cs.DS: Data Structures & Algorithms Citations 6 Venue Algorithmica Last Checked 4 months ago
Abstract
We study a scheduling problem arising in demand response management in smart grid. Consumers send in power requests with a flexible feasible time interval during which their requests can be served. The grid controller, upon receiving power requests, schedules each request within the specified interval. The electricity cost is measured by a convex function of the load in each timeslot. The objective is to schedule all requests with the minimum total electricity cost. Previous work has studied cases where jobs have unit power requirement and unit duration. We extend the study to arbitrary power requirement and duration, which has been shown to be NP-hard. We give the first online algorithm for the general problem, and prove that the problem is fixed parameter tractable. We also show that the online algorithm is asymptotically optimal when the objective is to minimize the peak load. In addition, we observe that the classical non-preemptive machine minimization problem is a special case of the smart grid problem with min-peak objective, and show that we can solve the non-preemptive machine minimization problem asymptotically optimally.
Community shame:
Not yet rated
Community Contributions

Found the code? Know the venue? Think something is wrong? Let us know!

πŸ“œ Similar Papers

In the same crypt β€” Data Structures & Algorithms

Died the same way β€” πŸ‘» Ghosted