An Optimized Analogy-Based Project Effort Estimation
March 11, 2017 Β· Declared Dead Β· π arXiv.org
"No code URL or promise found in abstract"
Evidence collected by the PWNC Scanner
Authors
Mohammad Azzeh, Yousef Elsheikh, Marwan Alseid
arXiv ID
1703.04563
Category
cs.SE: Software Engineering
Citations
20
Venue
arXiv.org
Last Checked
4 months ago
Abstract
Despite the predictive performance of Analogy-Based Estimation (ABE) in generating better effort estimates, there is no consensus on how to predict the best number of analogies, and which adjustment technique produces better estimates. This paper proposes a new adjusted ABE model based on optimizing and approximating complex relationships between features and reflects that approximation on the final estimate. The results show that the predictive performance of ABE has noticeably been improved, and the number of analogies was remarkably variable for each test project.
Community Contributions
Found the code? Know the venue? Think something is wrong? Let us know!
π Similar Papers
In the same crypt β Software Engineering
R.I.P.
π»
Ghosted
R.I.P.
π»
Ghosted
Microservices: yesterday, today, and tomorrow
π
π
The Cartographer
A Survey of Machine Learning for Big Code and Naturalness
R.I.P.
π»
Ghosted
An Overview on Smart Contracts: Challenges, Advances and Platforms
R.I.P.
π»
Ghosted
Slither: A Static Analysis Framework For Smart Contracts
R.I.P.
π»
Ghosted
ContractFuzzer: Fuzzing Smart Contracts for Vulnerability Detection
Died the same way β π» Ghosted
R.I.P.
π»
Ghosted
Federated Learning: Strategies for Improving Communication Efficiency
R.I.P.
π»
Ghosted
In-Datacenter Performance Analysis of a Tensor Processing Unit
R.I.P.
π»
Ghosted
Deep Convolutional Neural Networks for Computer-Aided Detection: CNN Architectures, Dataset Characteristics and Transfer Learning
R.I.P.
π»
Ghosted