The Preemptive Resource Allocation Problem
November 18, 2018 Β· Declared Dead Β· π Journal of Scheduling
"No code URL or promise found in abstract"
Evidence collected by the PWNC Scanner
Authors
Kanthi Sarpatwar, Baruch Schieber, Hadas Shachnai
arXiv ID
1811.07413
Category
cs.DS: Data Structures & Algorithms
Citations
4
Venue
Journal of Scheduling
Last Checked
4 months ago
Abstract
We revisit a classical scheduling model to incorporate modern trends in data center networks and cloud services. Addressing some key challenges in the allocation of shared resources to user requests (jobs) in such settings, we consider the following variants of the classic {\em resource allocation problem} (\textsf{RAP}). The input to our problems is a set $J$ of jobs and a set $M$ of homogeneous hosts, each has an available amount of some resource. A job is associated with a release time, a due date, a weight, and a given length, as well as its resource requirement. A \emph{feasible} schedule is an allocation of the resource to a subset of the jobs, satisfying the job release times/due dates as well as the resource constraints. A crucial distinction between classic {\textsf{RAP}} and our problems is that we allow preemption and migration of jobs, motivated by virtualization techniques. We consider two natural objectives: {\em throughput maximization} (\textsf{MaxT}), which seeks a maximum weight subset of the jobs that can be feasibly scheduled on the hosts in $M$, and {\em resource minimization} (\textsf{MinR}), that is finding the minimum number of (homogeneous) hosts needed to feasibly schedule all jobs. Both problems are known to be NP-hard. We first present a $Ξ©(1)$-approximation algorithm for \textsf{MaxT} instances where time-windows form a laminar family of intervals. We then extend the algorithm to handle instances with arbitrary time-windows, assuming there is sufficient slack for each job to be completed. For \textsf{MinR} we study a more general setting with $d$ resources and derive an $O(\log d)$-approximation for any fixed $d \geq 1$, under the assumption that time-windows are not too small. This assumption can be removed leading to a slightly worse ratio of $O(\log d\log^* T)$, where $T$ is the maximum due date of any job.
Community Contributions
Found the code? Know the venue? Think something is wrong? Let us know!
π Similar Papers
In the same crypt β Data Structures & Algorithms
π
π
The Cartographer
R.I.P.
π»
Ghosted
Route Planning in Transportation Networks
R.I.P.
π»
Ghosted
Near-linear time approximation algorithms for optimal transport via Sinkhorn iteration
R.I.P.
π»
Ghosted
Hierarchical Clustering: Objective Functions and Algorithms
R.I.P.
π»
Ghosted
Graph Isomorphism in Quasipolynomial Time
π
π
The Cartographer
Simulation optimization: A review of algorithms and applications
Died the same way β π» Ghosted
R.I.P.
π»
Ghosted
Federated Learning: Strategies for Improving Communication Efficiency
R.I.P.
π»
Ghosted
In-Datacenter Performance Analysis of a Tensor Processing Unit
R.I.P.
π»
Ghosted
Deep Convolutional Neural Networks for Computer-Aided Detection: CNN Architectures, Dataset Characteristics and Transfer Learning
R.I.P.
π»
Ghosted