Is it Possible to Disregard Obsolete Requirements? - An Initial Experiment on a Potentially New Bias in Software Effort Estimation

April 04, 2019 Β· Declared Dead Β· πŸ› IEEE/ACM International Conference on Connected Health: Applications, Systems and Engineering Technologies

πŸ‘» CAUSE OF DEATH: Ghosted
No code link whatsoever

"No code URL or promise found in abstract"

Evidence collected by the PWNC Scanner

Authors Lucas Gren, Richard Berntsson Svensson, Michael Unterkalmsteiner arXiv ID 1904.02477 Category cs.SE: Software Engineering Citations 6 Venue IEEE/ACM International Conference on Connected Health: Applications, Systems and Engineering Technologies Last Checked 4 months ago
Abstract
Effort estimation is a complex area in decision-making, and is influenced by a diversity of factors that could increase the estimation error. The effects on effort estimation accuracy of having obsolete requirements in specifications have not yet been studied. This study aims at filling that gap. A total of 150 students were asked to provide effort estimates for different amounts of requirements, and one group was explicitly told to disregard some of the given requirements. The results show that even the extra text instructing participants to exclude requirements in the estimation task, had the subjects give higher estimates. The effect of having obsolete requirements in requirements specifications and backlogs in software effort estimation is not taken into account enough today, and this study provides empirical evidence that it possibly should. We also suggest different psychological explanations to the found effect.
Community shame:
Not yet rated
Community Contributions

Found the code? Know the venue? Think something is wrong? Let us know!

πŸ“œ Similar Papers

In the same crypt β€” Software Engineering

Died the same way β€” πŸ‘» Ghosted