Approximation Algorithms for Interdiction Problem with Packing Constraints
April 23, 2022 Β· Declared Dead Β· π International Colloquium on Automata, Languages and Programming
"No code URL or promise found in abstract"
Evidence collected by the PWNC Scanner
Authors
Lin Chen, Xiaoyu Wu, Guochuan Zhang
arXiv ID
2204.11106
Category
cs.DS: Data Structures & Algorithms
Cross-listed
cs.CC
Citations
2
Venue
International Colloquium on Automata, Languages and Programming
Last Checked
4 months ago
Abstract
We study a bilevel optimization problem which is a zero-sum Stackelberg game. In this problem, there are two players, a leader and a follower, who pick items from a common set. Both the leader and the follower have their own (multi-dimensional) budgets, respectively. Each item is associated with a profit, which is the same to the leader and the follower, and will consume the leader's (follower's) budget if it is selected by the leader (follower). The leader and the follower will select items in a sequential way: First, the leader selects items within the leader's budget. Then the follower selects items from the remaining items within the follower's budget. The goal of the leader is to minimize the maximum profit that the follower can obtain. Let $s_A$ and $s_B$ be the dimension of the leader's and follower's budget, respectively. A special case of our problem is the bilevel knapsack problem studied by Caprara et al. [SIAM Journal on Optimization, 2014], where $s_A=s_B=1$. We consider the general problem and obtain an $(s_B+Ξ΅)$-approximation algorithm when $s_A$ and $s_B$ are both constant. In particular, if $s_B=1$, our algorithm implies a PTAS for the bilevel knapsack problem, which is the first O(1)-approximation algorithm. We also complement our result by showing that there does not exist any $(4/3-Ξ΅)$-approximation algorithm even if $s_A=1$ and $s_B=2$. We also consider a variant of our problem with resource augmentation when $s_A$ and $s_B$ are both part of the input. We obtain an O(1)-approximation algorithm with O(1)-resource augmentation, that is, we give an algorithm that returns a solution which exceeds the given leader's budget by O(1) times, and the objective value achieved by the solution is O(1) times the optimal objective value that respects the leader's budget.
Community Contributions
Found the code? Know the venue? Think something is wrong? Let us know!
π Similar Papers
In the same crypt β Data Structures & Algorithms
π
π
The Cartographer
R.I.P.
π»
Ghosted
Route Planning in Transportation Networks
R.I.P.
π»
Ghosted
Near-linear time approximation algorithms for optimal transport via Sinkhorn iteration
R.I.P.
π»
Ghosted
Hierarchical Clustering: Objective Functions and Algorithms
R.I.P.
π»
Ghosted
Graph Isomorphism in Quasipolynomial Time
π
π
The Cartographer
Simulation optimization: A review of algorithms and applications
Died the same way β π» Ghosted
R.I.P.
π»
Ghosted
Federated Learning: Strategies for Improving Communication Efficiency
R.I.P.
π»
Ghosted
In-Datacenter Performance Analysis of a Tensor Processing Unit
R.I.P.
π»
Ghosted
Deep Convolutional Neural Networks for Computer-Aided Detection: CNN Architectures, Dataset Characteristics and Transfer Learning
R.I.P.
π»
Ghosted