What Happens When We Fuzz? Investigating OSS-Fuzz Bug History
May 19, 2023 Β· Declared Dead Β· π IEEE Working Conference on Mining Software Repositories
"No code URL or promise found in abstract"
Evidence collected by the PWNC Scanner
Authors
Brandon Keller, Andrew Meneely, Benjamin Meyers
arXiv ID
2305.11433
Category
cs.SE: Software Engineering
Citations
6
Venue
IEEE Working Conference on Mining Software Repositories
Last Checked
4 months ago
Abstract
BACKGROUND: Software engineers must be vigilant in preventing and correcting vulnerabilities and other critical bugs. In servicing this need, numerous tools and techniques have been developed to assist developers. Fuzzers, by autonomously generating inputs to test programs, promise to save time by detecting memory corruption, input handling, exception cases, and other issues. AIMS: The goal of this work is to empower developers to prioritize their quality assurance by analyzing the history of bugs generated by OSS-Fuzz. Specifically, we examined what has happened when a project adopts fuzzing as a quality assurance practice by measuring bug lifespans, learning opportunities, and bug types. METHOD: We analyzed 44,102 reported issues made public by OSS-Fuzz prior to March 12, 2022. We traced the Git commit ranges reported by repeated fuzz testing to the source code repositories to identify how long fuzzing bugs remained in the system, who fixes these bugs, and what types of problems fuzzers historically have found. We identified the bug-contributing commits to estimate when the bug containing code was introduced, and measure the timeline from introduction to detection to fix. RESULTS: We found that bugs detected in OSS-Fuzz have a median lifespan of 324 days, but that bugs, once detected, only remain unaddressed for a median of 2 days. Further, we found that of the 8,099 issues for which a source committing author can be identified, less than half (45.9%) of issues were fixed by the same author that introduced the bug. CONCLUSIONS: The results show that fuzzing can be used to makes a positive impact on a project that takes advantage in terms of their ability to address bugs in a time frame conducive to fixing mistakes prior to a product release.
Community Contributions
Found the code? Know the venue? Think something is wrong? Let us know!
π Similar Papers
In the same crypt β Software Engineering
R.I.P.
π»
Ghosted
R.I.P.
π»
Ghosted
Microservices: yesterday, today, and tomorrow
π
π
The Cartographer
A Survey of Machine Learning for Big Code and Naturalness
R.I.P.
π»
Ghosted
An Overview on Smart Contracts: Challenges, Advances and Platforms
R.I.P.
π»
Ghosted
Slither: A Static Analysis Framework For Smart Contracts
R.I.P.
π»
Ghosted
ContractFuzzer: Fuzzing Smart Contracts for Vulnerability Detection
Died the same way β π» Ghosted
R.I.P.
π»
Ghosted
Federated Learning: Strategies for Improving Communication Efficiency
R.I.P.
π»
Ghosted
In-Datacenter Performance Analysis of a Tensor Processing Unit
R.I.P.
π»
Ghosted
Deep Convolutional Neural Networks for Computer-Aided Detection: CNN Architectures, Dataset Characteristics and Transfer Learning
R.I.P.
π»
Ghosted