Collision-Free Robot Scheduling

February 19, 2024 Β· Declared Dead Β· πŸ› ALGOWIN

πŸ‘» CAUSE OF DEATH: Ghosted
No code link whatsoever

"No code URL or promise found in abstract"

Evidence collected by the PWNC Scanner

Authors Duncan Adamson, Nathan Flaherty, Igor Potapov, Paul Spirakis arXiv ID 2402.12019 Category cs.DS: Data Structures & Algorithms Citations 1 Venue ALGOWIN Last Checked 4 months ago
Abstract
Robots are becoming an increasingly common part of scientific work within laboratory environments. In this paper, we investigate the problem of designing \emph{schedules} for completing a set of tasks at fixed locations with multiple robots in a laboratory. We represent the laboratory as a graph with tasks placed on fixed vertices and robots represented as agents, with the constraint that no two robots may occupy the same vertex at any given timestep. Each schedule is partitioned into a set of timesteps, corresponding to a walk through the graph (allowing for a robot to wait at a vertex to complete a task), with each timestep taking time equal to the time for a robot to move from one vertex to another and each task taking some given number of timesteps during the completion of which a robot must stay at the vertex containing the task. The goal is to determine a set of schedules, with one schedule for each robot, minimising the number of timesteps taken by the schedule taking the greatest number of timesteps within the set of schedules. We show that this problem is NP-complete for many simple classes of graphs, the problem of determining the fastest schedule, defined by the number of time steps required for a robot to visit every vertex in the schedule and complete every task assigned in its assigned schedule. Explicitly, we provide this result for complete graphs, bipartite graphs, star graphs, and planar graphs. Finally, we provide positive results for line graphs, showing that we can find an optimal set of schedules for $k$ robots completing $m$ tasks of equal length of a path of length $n$ in $O(kmn)$ time, and a $k$-approximation when the length of the tasks is unbounded.
Community shame:
Not yet rated
Community Contributions

Found the code? Know the venue? Think something is wrong? Let us know!

πŸ“œ Similar Papers

In the same crypt β€” Data Structures & Algorithms

Died the same way β€” πŸ‘» Ghosted