Minimizing the Number of Tardy Jobs with Uniform Processing Times on Parallel Machines
April 22, 2024 Β· Declared Dead Β· π Symposium on Theoretical Aspects of Computer Science
"No code URL or promise found in abstract"
Evidence collected by the PWNC Scanner
Authors
Klaus Heeger, Hendrik Molter
arXiv ID
2404.14208
Category
cs.DS: Data Structures & Algorithms
Citations
3
Venue
Symposium on Theoretical Aspects of Computer Science
Last Checked
4 months ago
Abstract
In this work, we study the computational (parameterized) complexity of $P \mid r_j, p_j=p \mid \sum_j w_j U_j$. Here, we are given $m$ identical parallel machines and $n$ jobs with equal processing time, each characterized by a release date, a due date, and a weight. The task is to find a feasible schedule, that is, an assignment of the jobs to starting times on machines, such that no job starts before its release date and no machine processes several jobs at the same time, that minimizes the weighted number of tardy jobs. A job is considered tardy if it finishes after its due date. Our main contribution is showing that $P \mid r_j, p_j=p \mid \sum_j U_j$ (the unweighted version of the problem) is NP-hard and W[2]-hard when parameterized by the number of machines. The former resolves an open problem in Note 2.1.19 by Kravchenko and Werner [Journal of Scheduling, 2011] and Open Problem 2 by Sgall [ESA, 2012], and the latter resolves Open Problem 7 by Mnich and van Bevern [Computers & Operations Research, 2018]. Furthermore, our result shows that the known XP-algorithm for $P \mid r_j, p_j=p \mid \sum_j w_j U_j$ parameterized by the number of machines is optimal from a classification standpoint. On the algorithmic side, we provide alternative running time bounds for the above-mentioned known XP-algorithm. Our analysis shows that $P \mid r_j, p_j=p \mid \sum_j w_j U_j$ is contained in XP when parameterized by the processing time, and that it is contained in FPT when parameterized by the combination of the number of machines and the processing time. Finally, we give an FPT-algorithm for $P \mid r_j, p_j=p \mid \sum_j w_j U_j$ parameterized by the number of release dates or the number of due dates. With this work, we lay out the foundation for a systematic study of the parameterized complexity of $P \mid r_j, p_j=p \mid \sum_j w_j U_j$.
Community Contributions
Found the code? Know the venue? Think something is wrong? Let us know!
π Similar Papers
In the same crypt β Data Structures & Algorithms
π
π
The Cartographer
R.I.P.
π»
Ghosted
Route Planning in Transportation Networks
R.I.P.
π»
Ghosted
Near-linear time approximation algorithms for optimal transport via Sinkhorn iteration
R.I.P.
π»
Ghosted
Hierarchical Clustering: Objective Functions and Algorithms
R.I.P.
π»
Ghosted
Graph Isomorphism in Quasipolynomial Time
π
π
The Cartographer
Simulation optimization: A review of algorithms and applications
Died the same way β π» Ghosted
R.I.P.
π»
Ghosted
Federated Learning: Strategies for Improving Communication Efficiency
R.I.P.
π»
Ghosted
In-Datacenter Performance Analysis of a Tensor Processing Unit
R.I.P.
π»
Ghosted
Deep Convolutional Neural Networks for Computer-Aided Detection: CNN Architectures, Dataset Characteristics and Transfer Learning
R.I.P.
π»
Ghosted