Resource Leveling: Complexity of a UET two-processor scheduling variant and related problems

June 12, 2024 ยท The Ethereal ยท ๐Ÿ› arXiv.org

๐Ÿ”ฎ THE ETHEREAL: The Ethereal
Pure theory โ€” exists on a plane beyond code

"No code URL or promise found in abstract"

Evidence collected by the PWNC Scanner

Authors Pascale Bendotti, Luca Brunod Indrigo, Philippe Chrรฉtienne, Bruno Escoffier arXiv ID 2406.08104 Category cs.CC: Computational Complexity Cross-listed cs.DS Citations 0 Venue arXiv.org Last Checked 3 months ago
Abstract
This paper mainly focuses on a resource leveling variant of a two-processor scheduling problem. The latter problem is to schedule a set of dependent UET jobs on two identical processors with minimum makespan. It is known to be polynomial-time solvable. In the variant we consider, the resource constraint on processors is relaxed and the objective is no longer to minimize makespan. Instead, a deadline is imposed on the makespan and the objective is to minimize the total resource use exceeding a threshold resource level of two. This resource leveling criterion is known as the total overload cost. Sophisticated matching arguments allow us to provide a polynomial algorithm computing the optimal solution as a function of the makespan deadline. It extends a solving method from the literature for the two-processor scheduling problem. Moreover, the complexity of related resource leveling problems sharing the same objective is studied. These results lead to polynomial or pseudo-polynomial algorithms or NP-hardness proofs, allowing for an interesting comparison with classical machine scheduling problems.
Community shame:
Not yet rated
Community Contributions

Found the code? Know the venue? Think something is wrong? Let us know!

๐Ÿ“œ Similar Papers

In the same crypt โ€” Computational Complexity