A Flexible Job Shop Scheduling Problem Involving Reconfigurable Machine Tools Under Industry 5.0
October 16, 2024 ยท Declared Dead ยท ๐ Advances in Production Management Systems
"No code URL or promise found in abstract"
Evidence collected by the PWNC Scanner
Authors
Hessam Bakhshi-Khaniki, Reza Tavakkoli-Moghaddam, Zdenek Hanzalek, Behdin Vahedi-Nouri
arXiv ID
2410.23302
Category
cs.NE: Neural & Evolutionary
Citations
2
Venue
Advances in Production Management Systems
Last Checked
4 months ago
Abstract
The rise of Industry 5.0 has introduced new demands for manufacturing companies, requiring a shift in how production schedules are managed to address human centered, environmental, and economic goals comprehensively. The flexible job shop scheduling problem (FJSSP), which involves processing operations on various capable machines, accurately reflects the complexities of modern manufacturing settings. This paper investigates the FJSSP involving reconfigurable machine tools with configuration dependent setup times, while integrating human aspects like worker assignments, moving time, and rest periods, as well as minimizing total energy consumption. A mixed-integer programming (MIP) model is developed to simultaneously optimize these objectives. The model determines the assignment of operations to machines, workers, and configurations while sequencing operations, scheduling worker movements, and respecting rest periods, and minimizing overall energy consumption. Given the NPhard nature of the FJSSP with worker assignments and reconfigurable tools, a memetic algorithm (MA) is proposed. This metaheuristic evolutionary algorithm features a three layer chromosome encoding method, specialized crossover and mutation strategies, and neighborhood search mechanisms to enhance solution quality and diversity. Comparisons of MA with MIP and genetic algorithms (GA) on benchmark instances demonstrate the MA efficiency and effectiveness, particularly for larger problem instances where MIP becomes impractical. This research paves the way for sustainable and resilient production schedules tailored for the factory of the future under the Industry 5.0 paradigm. The work bridges a crucial gap in current literature by integrating worker and environmental impact into the FJSSP with reconfigurable machine models.
Community Contributions
Found the code? Know the venue? Think something is wrong? Let us know!
๐ Similar Papers
In the same crypt โ Neural & Evolutionary
๐ฎ
๐ฎ
The Ethereal
R.I.P.
๐ป
Ghosted
Deep Learning using Rectified Linear Units (ReLU)
R.I.P.
๐ป
Ghosted
Generative Adversarial Text to Image Synthesis
R.I.P.
๐ป
Ghosted
Regularized Evolution for Image Classifier Architecture Search
R.I.P.
๐ป
Ghosted
Temporal Ensembling for Semi-Supervised Learning
๐
๐
Old Age
Learning Structured Sparsity in Deep Neural Networks
Died the same way โ ๐ป Ghosted
R.I.P.
๐ป
Ghosted
Federated Learning: Strategies for Improving Communication Efficiency
R.I.P.
๐ป
Ghosted
In-Datacenter Performance Analysis of a Tensor Processing Unit
R.I.P.
๐ป
Ghosted
Deep Convolutional Neural Networks for Computer-Aided Detection: CNN Architectures, Dataset Characteristics and Transfer Learning
R.I.P.
๐ป
Ghosted